Project overview: Water and Hygiene

Further projects:

 

  • 2024: Ibrahimnagor (Nabiganj): Extension of the pipeline by a further 100 metres; development of methods for disinfecting the tank facilities and pipes; (funded by the Ein-Zehntel Foundation)
  • 2024: Rural regions (Nabigonj): Distribution of 1,000 household filters for arsenic removal (funded by the Schmitz Foundation and the Federal Ministry for Economic Cooperation and Development)
  • 2024: Ullapara (Siragonj), Nabigonj area: Installation of 20 sand and manganese filters to remove iron and arsenic from drinking water wells at schools and madrasas

 

  • 2023, Ibrahimnagor (Nabiganj): Pipelines supplying the village from two existing deep wells.
  • 2023, Lahiri Mohonpure (Ullapara): A medium-depth well with an electric pump and pipework to supply the market (instead of a SIDKO filter).
  • 2023, Kanaipur (Nabiganj): A deep well to supply the market square and the surrounding households.
  • 2023, Kanaipur (Nabiganj): Repair of a deep well and installation of an electric pump and tank.
  • 2023, Gujakhair (Nabiganj): Cleaning and repair of a deep well at the primary school, and installation of an electric pump, tanks and pipework for the village.
  • 2023, Korgaon (Nabiganj): Repair of a faulty deep well.

 

  • 2022, Dadpur (Ullapara): Pipes running from a good well to the secondary school, the primary school and the village.
  • 2022, Korgaon (Nabiganj): Sand filters on primary school well to remove iron
  • 2022, Sherpur (Nabiganj): Pipes and sand filters at the primary school to extend the water supply to the madrasa and the village.

 

  • 2020, Boalia (Ullapara): Pipes running from the deep well on the market square to the primary school and the livestock market.

 

Go back